Subdivisions Appendix B. - Preliminary And Final Plat Review And Approval Form


Latest version.
  • SUBDIVISIONS APPENDIX B. - PRELIMINARY AND FINAL PLAT REVIEW AND APPROVAL FORM

    General Requirements

    Name of subdivision .....

    Name of owner(s) .....

    Date submitted ____________ checked by .....

    Required number of copies of plat submitted .....

    Topographic map required:   Yes ____________ No ____________

    Location of subdivision (Section, Township and Range) .....
    .....

    Has plat been prepared at the appropriate scale:   Yes ____________ No ____________

    Present zoning classification of area .....

    General Platting Requirements

    Preliminary Plat
    Final Plat
    Yes No Yes No
    1. Is the subdivision laid out to conform with the approved master plan of the area? ..... ..... ..... .....
    2. Does the street pattern discourage through traffic? ..... ..... ..... .....
    3. Do the streets intersect at as nearly 90 degree angles as possible? ..... ..... ..... .....
    4. Are the number of streets converging at one point kept to a minimum? ..... ..... ..... .....
    5. Have provisions been made for principal local streets to be continued in adjacent subdivisions without creating hazardous jogs or angles in the thoroughfare pattern? ..... ..... ..... .....
    6. If cul-de-sacs are shown, do they:
    a.  Have adequate turn around facilities? (100 feet diameter minimum) ..... ..... ..... .....
    b.  Remain a conventional length of not more than 600 feet? ..... ..... ..... .....
    7. Are blocks a normal size (approximately 1,000 feet in length)? ..... ..... ..... .....
    8. If a block is excessively long (1,200 feet), has a pedestrian crossing been provided in the middle of the block? ..... ..... ..... .....
    Required Physical Improvements
    1. Has due consideration been given by the subdivider regarding dedication of that portion of land necessary for public use? (school sites, park sites, etc.) ..... ..... ..... .....
    2. Have all necessary easements for utilities been checked to determine whether they meet the requirements of the utility company? ..... ..... ..... .....
    3. Have the locations, widths, and other dimensions of proposed streets, alleys, lots, easements, and other open spaces been clearly shown? ..... ..... ..... .....
    4. Are all blocks and lots properly numbered? ..... ..... ..... .....
    5. Do all streets and courts shown on the plat bear tentative names? ..... ..... ..... .....
    6. List of the names of streets, courts, of boulevards shown on the plat.
    a.  .....
    b.  .....
    c.  .....
    d.  .....
    Do any of the tentative names listed conflict with any existing street names? ..... ..... ..... .....
    7. Is the accurate location and description of all monuments clearly shown? (Permanent monuments of natural stone or concrete should be set to finish grade at such critical points as will enable any skilled surveyor to lay out correctly any lot in the subdivision.) ..... ..... ..... .....
    8. Has the length of lines of all lots, the length and bearing of the lines of all streets, alleys, and easements, the length of all arcs, and radii, the points of curvature, and the tangent bearings in the case of curved lines been checked by the county road superintendent? ..... ..... ..... .....
    9. Do all necessary signatures appear on the plat? ..... ..... ..... .....
    10. Is the north point, date, scale, and name of the firm which designed the plat clearly shown? ..... ..... ..... .....
    Zoning Ordinance Requirements
    1. Does the zoning classification of all parcels of land appear on the plat? ..... ..... ..... .....
    2. Are all lots delineated of adequate size to meet the requirements of the appropriate zoning classifications? ..... ..... ..... .....
    3. Will a performance bond be required? ..... ..... ..... .....
    4. Performance bond set at $ .....
    Approval Granted
    1. Preliminary plat: ..... .....
    2. Final plat: ..... .....
    List of all suggested revisions or changes.
    1. ____________
    2. ____________
    3. ____________
    4. ____________

    sub-apb-1.jpg

    Procedure for Plat Approval