§ 4-191. Best management practice (BMP).  


Latest version.
  • (a)

    Definitions. Structural device, measure, facility, or activity that helps to achieve stormwater management control objectives at a designated site.

    (b)

    Plan. A document approved at the site design phase that outlines the measures and practices used to control stormwater runoff at a site. The plan shall be prepared by a professional engineer. The subdivision regulations and the building code shall be revised to include these regulations.

(Ord. No. A-239, § I, 2-24-2003)