§ 4-192. Design.  


Latest version.
  • (a)

    All stormwater BMPs shall be designed in a manner to minimize the need for maintenance and reduce the chances of failure. Design guidelines are outlined in the most recent version of the subdivision regulations of the city.

    (b)

    Stormwater easements and covenants shall be provided by the property owner for access for facility inspections and maintenance. Easements and covenants shall be recorded with the city prior to the issuance of a permit.

    (c)

    Final design shall be approved by the city engineer.

    (d)

    The property owner/developer will acquire an NPDES permit from ADEM and present a copy to the city engineer.

    (e)

    A permit will be issued by the city engineer prior to construction start up. This permit acknowledges receipt of proper BMP and ADEM permit.

(Ord. No. A-239, § II, 2-24-2003)